Description
Rhenium Wire and Ribbon. Rhenium Wire and Ribbon is used to manufacture filaments for mass spectrometers and ion gauges as well as medical applications.
Rhenium Wire (99.97% Purity) | ||||||||||||
Part No. | Diameter (in) | Diameter (mm) | (ohms/cm) | Stock/ Lead Time |
UOM | Price | Order | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
W3 | Rhenium Wire, for use on Finnigan 4500, 4600, TSQ | |||||||||||
0.003 | 0.076 | 0.42544 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $44.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W4 | Rhenium Wire, for use on Finnigan DEP Filaments | |||||||||||
0.004 | 0.10 | 0.24574 | DISCONTINUED | Foot | --- | --- | ||||||
W43 | Rhenium Wire | |||||||||||
0.0045 | 0.113 | 0.19426 | DISCONTINUED | Foot | --- | --- | ||||||
W5 | Rhenium Wire | |||||||||||
0.005 | 0.127 | 0.15236 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $60.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W6 | Rhenium Wire | |||||||||||
0.0055 | 0.14 | 0.12538 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $65.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W7 | Rhenium Wire | |||||||||||
0.006 | 0.15 | 0.10922 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $67.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W8 | Rhenium Wire, for use on Finnigan CH4, CH5, CH7 | |||||||||||
0.007 | 0.178 | 0.07756 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $70.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W9 | Rhenium Wire | |||||||||||
0.008 | 0.20 | 0.06143 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $75.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W9A | Rhenium Wire | |||||||||||
0.009 | 0.23 | 0.05040 | DISCONTINUED | Foot | --- | --- | ||||||
W10 | Rhenium Wire | |||||||||||
0.010 | 0.25 | 0.03932 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $77.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W11 | Rhenium Wire | |||||||||||
0.012 | 0.30 | 0.02730 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $84.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W13 | Rhenium Wire | |||||||||||
0.015 | 0.38 | 0.01702 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $99.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W14 | Rhenium Wire | |||||||||||
0.020 | 0.50 | 0.00983 | 48 hours*Standard lead time for wire is 48 hours. | Foot | $110.00§10 or more: 5% off; 50 or more: 10% off. | |||||||
W16 | Rhenium Wire | |||||||||||
0.025 | 0.64 | 0.00600 | DISCONTINUED | Foot | --- | --- | ||||||
Rhenium Ribbon (99.97% Purity) | ||||||||||||
Part No. | (ohms/cm) | Thickness (in) | Width (in) | Thickness (mm) | Width (mm) | Stock/ Lead Time |
UOM | Price | Order | |||
W19 | Rhenium Ribbon | |||||||||||
0.32061 | 0.0005 | 0.040 | 0.010 | 1.02 | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | Foot | $110.00§10 or more: 5% off; 50 or more: 10% off. | |||||
W20 | Rhenium Ribbon | |||||||||||
0.15137 | 0.001 | 0.020 | 0.025 | 0.51 | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | Foot | $111.00§10 or more: 5% off; 50 or more: 10% off. | |||||
W38 | Rhenium Ribbon | |||||||||||
0.10158 | 0.001 | 0.030 | 0.025 | 0.76 | 293 | IN | CALL§10 or more: 5% off; 50 or more: 10% off. | |||||
W456 | Rhenium Ribbon | |||||||||||
0.09680 | 0.001 | 0.0315 | 0.030 | 0.80 | DISCONTINUED | Foot | --- | --- | ||||
W457 | Rhenium Ribbon | |||||||||||
0.06850 | 0.001 | 0.0375 | 0.030 | 0.95 | DISCONTINUED | Foot | --- | --- | ||||
W21 | Rhenium Ribbon | |||||||||||
0.03039 | 0.001 | 0.100 | 0.025 | 2.54 | DISCONTINUED | Foot | --- | --- | ||||
W22 | Rhenium Ribbon | |||||||||||
0.09959 | 0.0015 | 0.020 | 0.038 | 0.51 | DISCONTINUED | Foot | --- | --- | ||||
W24 | Rhenium Ribbon | |||||||||||
0.07936 | 0.0015 | 0.025 | 0.038 | 0.64 | DISCONTINUED | Foot | --- | --- | ||||
W25 | Rhenium Ribbon | |||||||||||
0.74200 | 0.0015 | 0.028 | 0.040 | 0.71 | DISCONTINUED | Foot | --- | --- | ||||
W26 | Rhenium Ribbon, for use on Finnigan MAT 311,271,112 | |||||||||||
0.06683 | 0.0015 | 0.030 | 0.038 | 0.76 | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | Foot | $117.00§10 or more: 5% off; 50 or more: 10% off. | |||||
W27 | Rhenium Ribbon | |||||||||||
0.05906 | 0.0017 | 0.030 | 0.043 | 0.76 | DISCONTINUED | Foot | --- | --- | ||||
W39 | Rhenium Ribbon | |||||||||||
0.15137 | 0.002 | 0.010 | 0.051 | 0.25 | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | Foot | $150.00§10 or more: 5% off; 50 or more: 10% off. | |||||
W28 | Rhenium Ribbon | |||||||||||
0.07420 | 0.002 | 0.020 | 0.051 | 0.51 | DISCONTINUED | Foot | --- | --- | ||||
W29 | Rhenium Ribbon | |||||||||||
0.05913 | 0.002 | 0.025 | 0.051 | 0.64 | DISCONTINUED | Foot | --- | --- | ||||
W458 | Rhenium Ribbon | |||||||||||
0.05460 | 0.002 | 0.028 | 0.050 | 0.71 | DISCONTINUED | Foot | --- | --- | ||||
W30 | RHENIUM RIBBON .002 X.030 | |||||||||||
--- | --- | --- | --- | --- | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | Foot | CALL§10 or more: 5% off; 50 or more: 10% off. | |||||
W35 | RHENIUM RIBBON .002 X.050 | |||||||||||
--- | --- | --- | --- | --- | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | Foot | CALL§10 or more: 5% off; 50 or more: 10% off. | |||||
W37 | Rhenium Ribbon | |||||||||||
0.12697 | 0.003 | 0.008 | 0.076 | 0.20 | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | Foot | $125.00§10 or more: 5% off; 50 or more: 10% off. | |||||
W31 | Rhenium Ribbon, for use on Finnigan 4000, ITD | |||||||||||
0.11041 | 0.003 | 0.009 | 0.076 | 0.23 | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | EA | $125.00§10 or more: 5% off; 50 or more: 10% off. | |||||
W32 | Rhenium Ribbon | |||||||||||
0.10512 | 0.004 | 0.007 | 0.102 | 0.18 | 0‡Standard lead-time for non-stock items is approximately two weeks depending on the item. | Foot | $125.00§10 or more: 5% off; 50 or more: 10% off. | |||||
W33 | Rhenium Ribbon | |||||||||||
0.09461 | 0.004 | 0.008 | 0.102 | 0.20 | DISCONTINUED | EA | --- | --- | ||||
W36 | Rhenium Ribbon | |||||||||||
0.07569 | 0.004 | 0.010 | 0.102 | 0.25 | DISCONTINUED | Foot | --- | --- | ||||
W34 | Rhenium Ribbon, for use on 1015, 3000 series, OWA and 5100, Incos | |||||||||||
0.07361 | 0.0045 | 0.009 | 0.114 | 0.23 | DISCONTINUED | Foot | --- | --- | ||||
§ Quantity discount 10 or more: 5% off; 50 or more: 10% off. | ||||||||||||
* Standard lead time for wire is 48 hours. † Call for availability. ‡ Standard lead-time for non-stock items is approximately two weeks depending on the item. | ||||||||||||
Ordering information. International (non-US) prices available through your local dealer. |
- Wire Material for Scientific Applications A wide range of resistance type wires and precious metals for the repair and manufacture of filaments and heaters for mass spectrometers, SEM's and scientific instruments.
- MS Heaters and Temperature Sensors Replacement heaters and temperature sensors for your mass spectrometer.
- Heat Coils Standard size coils are used on several mass spectrometer heaters repaired by S.I.S.
- Platinum Resistance Thermometer Elements These PRT elements can be used with precision laboratory and industrial instruments.
The ALX6004 superfine aluminum oxide cleaning abrasive is the finest grit aluminum oxide abrasive.